婷婷丁香久久,日日夜夜天天久久,中文av岛国无码免费播放,国产最新进精品视频,一进一出下面喷白浆视频,天天夜夜人人,97免费在线观看视频

Electricians dispatched to repair high voltage wire to ensure post-holiday travel peak in China's Wuhan

Source: Xinhua| 2019-02-24 07:21:07|Editor: Li Xia
Video PlayerClose
CHINA-WUHAN-ELECTRICIAN-RUSH REPAIR (CN)

Aerial photo taken on Feb. 12, 2019 shows emergency worker Dong Jinbing (L) inspecting the high voltage wire with his workmate Wang Wensheng on the power transmission tower in the mountain area of Wuhan, capital of central China's Hubei Province. A team of electricians was dispatched to repair a high voltage wire that was broken due to thick layer of ice accumulation. After one day's work on the over 40-meter-high power transmission tower in bad weather condition, the team succeeded in fixing the failed power system that lowered the trains' speed causing delay during the post-holiday travel peak. This year's Spring Festival travel rush started on Jan. 21 and will last till March 1, with railway trips expected to hit 413 million in total, up 8.3 percent. (Xinhua/Xiao Yijiu)

   1 2 3 4 5 Next  

KEY WORDS:
EXPLORE XINHUANET
010020070750000000000000011100001378454891